Adams Road Closed this Weekend at I-75 for Bridge Demolition

Crews will be closing Adams Road in each direction at southbound I-75 this weekend for bridge removal starting at 10:00 p.m. Friday, May 19. The roadway is expected to reopen 5:00 a.m. Monday, May 22. The bridge work is part of the ongoing $91.8 million investment to reconstruct I-75 between South Boulevard and Coolidge Highway in Oakland County.

Road Closed Ahead

Road Closed Ahead

During the closure, traffic on northbound Adams Road will be detoured using eastbound Square Lake Road to northbound Coolidge Highway, then westbound South Boulevard back to Adams Road. Southbound traffic will be detoured via eastbound South Boulevard to southbound Coolidge Highway, then westbound Square Lake Road back to Adams Road. View the project map on Mi Drive: https://goo.gl/Zrv9G3.

Currently, both directions of I-75 are maintained on the northbound side of the freeway between Coolidge Highway and Auburn Road, with two lanes open in each direction.

By 5:00 a.m. Monday, Adams Road is expected to have one lane open in each direction under I-75.

Follow I-75 modernization progress on the web at www.modernize75.com, or follow on Facebook at www.facebook.com/modernize75 or on twitter at www.twitter.com/modernize75.

 

About Rochester Media

Rochester Media publishes The Community Edge digital newsletter of recently posted articles from Rochester Media, a hyper-local news outlet covering all things in and around Rochester, Rochester Hills, and Oakland Township. Send us you press releases and news happenings to editor@rochestermedia.com.

Speak Your Mind

*